Nigg Harbour


Nigg South Quay Development

Nigg South Quay Development, Nigg Scotland

 

Client

Globle Energy Group  

Principal Contractor

Mc Laughlin & Harvey  

Location

Nigg, Scotland

Principal Scope of Works

Dredging of hard material and side casting for TSD -12CD

Exposing existing piles to be reduced below -16.5CD

Duration

15 Weeks January 2015 – April 2015

Complexity

Average

 Nigg South Quay Development, Nigg Scotland

Challenge presented on this project.

-  Density & depth  of existing material between –10 to -12CD

Mc Laughlin & Harvey required an excavator with long reach capabilities to dredge and side cast hard bolder clay material at a depth of -12CD from the steel sheet wall into the path of a trailer suction dredger.

Foyle & Marine’s EX1200 has an outreach of 30M and a dredge depth of 18M. The client required these dredge capabilities to reduce the marine material around the existing piles to -16.5 to allow divers to cut the piles at -15CD. The excavator also completed a sweep of the dredge area removing any isolated hire areas and ensure the -12CD design level was achieved throughout.

Foyle & Marine’s 45T long reach excavator was also positioned along the new quay wall remove material built up within the steel sheet piles. This material was side casted into the path of a mult-cat plough for removal. 